Tranzcarr Heavy Haulage  
Tranzcarr Heavy HaulageTranzcarr Heavy Haulage ResourcesTranzcarr Logistical ServicesTranzcarr Heavy Haulage Major ProjectsTranzcarr Company History Tranzcarr Heavy HaulageTranzcarr Company HistoryWhat can we do for you?
 

 


A Cross Section of Company Projects
   
Superyacht Big Fish Superyacht Big Fish

45m Superyacht ‘Big Fish’
Tranzcarr handled the Haulout logistics from the build shed to launching ramp for the 45M Big Fish at McMullen & Wing Auckland.
The launch followed an exciting and dramatic two-day move for their largest vessel to date from the yard’s voluminous construction shed into the waters of the Tamaki River. The move went slowly and seamlessly as shipyard workers and families watched the massive yacht being moved from the shed with only centimeters to spare on each side.

Following sea trials the vessel will commence an historic circumnavigation, which will take her to Antarctica, the Amazon and then to the fabled Northeast Passage over the top of Russia. She anticipates being the first luxury yacht to complete the Northeast Passage, and to be the first vessel in history to complete a Polar Circumnavigation, entering both Arctic and Antarctic Circles, crossing all lines of meridian and passing or rounding all five major capes.

Origin Energy Origin Energy
Origin Energy
Transport 8 x LPG Bullets 168tonne each ex Port Taranaki to site at Kupe Gas Project South Taranaki. Project included rotating the bullets prior to haulage.
Meridian Westwind Wind Farm
Deugro NZ/Pauwels Transformers
2 x 94 tonne transformers to Meridian Westwind Wind Farm, Makara. Hauled through Wellington City and up a 5 kilometre 20 degree gradient to the Project Site. Included transfer of each unit from a 10 line trailer to a 7 line trailer for the steep haul and final positioning at site.
Kupe Gas Project
Robt Stone Ltd
Transport 16 Pipe Rack Module to Kupe Gas Project south Taranaki. Jack units up for install using Trailer Hydraulics.
Siemens NZ Ltd
Siemens NZ Limited
Siemens Generator 340tonne – Otahuhu Power Station.
Leighton Works
Leighton Works
Bridge Beams to SH 20 Project Manukau, up to 40metres in length and 60tonne.
Siemens NZ Ltd
Siemens NZ Limited
Transport 226T Transformer from ship's hook, Ports of Auckland to Otahuhu Power Station. Repeat project in December 2002.
Downer Engineering Brisbane
Downer Engineering Brisbane
Heavy haulage transport and installation contract Huntly e3p Project. Gas turbine 377 tonne. Generator 354 tonne. Transformer 255 tonne.
Click here for short video of this project
Central Motorway Project
Complete Joint Venture
Transport bridge beams up to 40m long and 65 tonne to Central Motorway Project.
Fitzroy Engineering Ltd
Fitzroy Engineering Ltd
Transport and install 3 x 85 tonne generators ex Auckland to Whirinaki Co-Generation Plant.

Mammoet / Foster Wheeler
Heavy haulage contract for NZRC upgrade at Marsden Point site. Heaviest load, Reactor 380 tonne.
Ports of Auckland
Ports of Auckland
Relocate 700 tonne Portainer Crane on site.

Pauwel Transformers
Transport and install 1 x 110 tonne transformer at the Silverdale sub station.

Easteel Industries
75 tonne boiler ex Dannevirke to Kaitaia.
Sensation Yachts
Sensation Yachts
Relocate Super Yacht Noble House for launch.
53m long 580 tonne.

NDA Engineering
Turnkey project for Dryer from Hamilton to Westland Dairy, Hokitika. Calandria Unit 24m x 3.8m dia x 55T.

Technix Group Limited
On site relocation of 3 x Oil Storage tanks, 42m diameter x 370 tonne each.

Fitzroy Engineering Limited
Transport and load onto barge 1 x Shiploader in broken down form. Included were loads up to 51m long x 8m wide, 160 tonne.

Alstom Transformers
Australia Turnkey project for 160 Tonne Transformer from Brisbane to New Zealand Aluminium Smelter at Tiwai Point, Southland.
Project included barging the unit direct from Brisbane to a purpose built landing on the beach at Tiwai Point, also off-loading and installation.

BHP New Zealand Steel Ltd
Complete relocation of Taharoa Ironsands Processing plant. Transport included:
  • Concentrator Barge - 26m L x 21.5m W x 17.5m H, 1000T
  • Surge Bin - 23m L x 21.2m W x 13.0m H, 450T
  • Dredge - 32m L x 12.0m W x 13.0m H, 250T
Contract included complete dismantle and reassembly, construction of road for transport, bridge to cross culvert dam, and suitable dry docks for loading and unloading three (3) main units.
Click here for short video of this project

Deugro Projects Pty
Transport and install 4 x 85 tonne generators Kinoya Power Station, Suva, Fiji.

Siemens NZ Limited
Extraction and transportation of 225T Transformer from plinth on site at Otahuhu Power Station to Ports of Auckland.

Owens Project Services Limited
Transport of 188T Transformer (in beam set) from Ports of Auckland to the Huntly Power Station.Total road train weight 395T.

Taioma Society
Transportation of tug 'TAIOMA' (340T) from 17th Avenue, Tauranga to Sulphur Point Slipway. Scope included jacking up and loading of tug onto trailer, and offloading onto slipway.
   
   

Tranzcarr Heavy Haulage Limited 134A Plunket Avenue (Head Office) Papatoetoe Auckland, New Zealand
PO Box 23194 Hunters Corner, Manukau 2155, New Zealand


EMAIL: info@tranzcarr.co.nz TEL: (64 9) 263 9900 FAX: (64 9) 278 3600
Tranzcarr Heavy Haulage privacy policy